Soc Trang 7 phase 1 wind farm

Location: Vinh Hai, Vinh Chau, Soc Trang Province, Viet Nam
Scope of work: 

Piling works PHC D800/60-70m (from November/2020 to March 2021)

total: 30,000md
Equipment’s Used:
1. Barge/crane: 3600 tons (71×18.5m)/200 ton, diesel hammer 10 ton…

2. Barge/crane: 9000 tons(100×27.5m)/250 ton, diesel hammer 10 ton…

3. Barge/crane: 1800 tons(52x16m)/150 ton, diesel hammer 10 ton…

4. Barge/crane: 3500 tons(63x20m)/250 ton, diesel hammer 10 ton…

5. Barge/crane: 5400 tons(76×24.5m)/300 ton, diesel hammer 10 ton…

6. Barge/crane: 5400 tons(73×24.5m)/150 ton, diesel hammer 10 ton…