Location: Dong Hai, Bac Lieu Province, Viet Nam
Scope of work:
Piling works PHC D800
Total: 10,000md
Equipment’s Used:
Barge 3600 tons, crawler crane 200 ton, diesel hammer 10 ton…
Location: Dong Hai, Bac Lieu Province, Viet Nam
Scope of work:
Piling works PHC D800
Total: 10,000md
Equipment’s Used:
Barge 3600 tons, crawler crane 200 ton, diesel hammer 10 ton…